1940's Character Home
403 Sixth Ave, New Westminster
This 1940's Detached Home. Permitted through the City of New Westminster. Project manager for all trades and designs.
Budget $250K - Timeline 6 months. Renovations including:
1. Demo 2. Refinishing existing hardwood. 3.Removing chimney from roof to basement 4. Opening wall in between kitchen & dining room, adding a wall with double sliding pocket doors for office. 5. Insulation and framing where walls were opened Updating all electrical. 6. Updating all plumbing. 7. Paint & Plaster throughout. 8. Passed all city inspections
Before Photos










After Photos

All electrical updated. Cracks in plaster fixed. Paint throughout.

Removed wood walls, added insulation, added walls to accommodate double sliding doors. All electrical updated. Cracks in plaster fixed. Paint throughout. Floors sanded and stained.

Removed wood walls, added insulation, added walls to accommodate double sliding doors. All electrical updated. Cracks in plaster fixed. Paint throughout. Floors sanded and stained.

Removed wall and chimney. Added in custom kitchen. All plumbing updated. All electrical updated. Cracks in plaster fixed. Paint throughout. Floors sanded and stained.

Removed wall and chimney. Added in custom kitchen. All plumbing updated. All electrical updated. Cracks in plaster fixed. Paint throughout. Floors sanded and stained.

Removed wall and extended the size of powder room. Added in heated floors. Added wainscotting. Kept original sink. All plumbing updated. All electrical updated. Cracks in plaster fixed. Paint throughout.

Removed wall and chimney which allowed room for a double sink vanity. Insulated walls and attic. All plumbing updated. All electrical updated. Cracks in plaster fixed. Added in heated floors. Added wainscotting.

All electrical updated. Cracks in plaster fixed. Paint throughout. Sanded floors and applied a walnut stain.

All electrical updated. Cracks in plaster fixed. Paint throughout. Sanded floors and applied a walnut stain.

All electrical updated. Cracks in plaster fixed. Paint throughout. Sanded floors and applied a natural stain. Added wainscotting.